|
UA’s Wright outlines plans for biosciences park
Calling it the only time where three strikes led to a home run, Bruce Wright, associate vice president for economic development at the University of Arizona, said it was only after repeated failed attempts the university finally reached a deal to acquire a portion of 350-acres near Kino Parkway and East 36th Street for a biosciences park.
Speaking at a meeting of the Tucson chapter of Commercial Real Estate Women May 17, Wright said he failed in his attempt to get the property donated and condemned by the city. Then, when the UA attempted to purchase the site from Sinclair Oil, he was outbid by KB Home.
But in the process, KB Home agreed to a land exchange in which it would acquire some land in the UA’s Science and Technology Park near Interstate 10 and South Kolb Road in exchange for 80 of the 350 acres at the Kino Parkway site. The deal, scheduled to close in July, will give the university the location it wants for a biosciences park, key to UA Office of Economic Development’s campaign to make Tucson a center for biological and pharmaceutical research.
With biosciences compared to microelectronics in its importance to the 21st century economy, Wright said Tucson needs to be a research and development center. To succeed, he said the city needs to overcome the "missing links," in facilities and personnel, that could mean the difference between success and failure.
Noting "our ability to compete with other centers, such as San Diego, depends on being able to offer world class facilities," Wright said the biosciences park, between the UA’s main campus and Tucson International Airport, can provide a place for nurturing start-up companies. It can also be combined with the Critical Path Institute (C-Path) to draw pharmaceuticals research from around the world to Tucson.
The biosciences park will be anchored by a 660,000-square-foot research center, featuring dry lab and wet lab space. Plans are also being made for a hotel and conference center.
"We’ve looked at the best and brightest of comparable facilities around the world and come up with a plan to attract researchers by providing an environment they want," Wright said.
Being designed to ultimately incorporate 3 million square feet of laboratory and office space, retail, conference space and housing for post-graduate and post-doctoral researchers, Wright said, "We’ll be offering a place that will capture innovation, here."
A request for proposals is due to go out this fall with an eye to breaking ground on the first phase in January.
"We’ll be looking for support from the university and the state and private donors to pay for it, as we move forward," Wright said.
After its established, Wright says the second phase should be easier. Although construction of a biological research center can cost as much as $1,200 per square foot, he said, "Bringing business, research and education together at the same location will make the buildings secondary to what’s happening inside the park."
The university will provide the site lease and the development plan, "but we expect that, by that point, it will be private business that will take the lead."
Contact Philip S. Moore at [email protected] or at (520) 295-4238.
Philip S. Moore
Inside Tucson Business |